Castner Kellner Plant
Provision of Full Project Lifecycle Project Management Services, for a Portfolio of critical enabling projects supporting Project Summer, Including a new site wide Firewater Deluge System, which included 800m of underground pipework installation, an new Pump House and two Deluge Valve Houses.
The portfolio also included:
A 500m Chlorine Gas pipeline to delivery Chlorine Gas across the site.
Installation of a medium pressure let-down to trains 1 & 2 in the Chlorine Compressor House to raise the delivery pressure of Chlorine gas onsite.
Extensive modifications to the Tanker Loading facility to upgrade the capability to allow loading to multiple tankers simultaneously.
The destruct and replacement of several large Quench and Distillation vessels.
Demolition of an existing storage tank and design, construction and commissioning of a large EDC Storage tank.
Design to resize and replace two new Boiler Feed Water Pumps and associated pipework